
Summer is the peak period for construction projects, including the application of stone-like paint on walls. Summer weather conditions help form a better stone-like paint film on walls. In addition, longer daylight hours allow a proper extension of construction time, thus shortening the overall construction period. Therefore, many construction companies choose to carry out wall stone-like paint construction in summer. The following factors should be noted when using stone-like paint in summer:
1. Influence of temperature:
Do not apply the paint when the temperature is below 5°C, or before and after rain. Besides, the temperature difference between morning/evening and noon is quite large. Do not construct on walls that remain cold until noon, as this will result in poor adhesion. Special attention is required.
2. Influence of wind:
Construction should be suspended in strong winds, especially at lower temperatures. Wind may lower the wall temperature below the air temperature. To avoid wind effects, take care to shield the area with waterproof cloth.
3. Influence of rain:
If the coating is exposed to rain before drying, it will adversely affect the finished surface. Attention should be paid to weather conditions not only during but also after construction. If it rains before construction, moisture will remain on the base surface, increasing its moisture content; construction should not be forced under such conditions. Before rain, cover the parts of the base surface to be constructed with waterproof cloth to ensure proper construction. Do not construct on base surfaces where the moisture content exceeds the specified standard. Failure to follow operating regulations will cause the coating film to peel off.
4. Influence of humidity:
Construction under high humidity will slow down the drying speed, so pay attention to ventilation. Construction should be suspended when humidity exceeds 80%. Poor construction conditions due to climate mainly concentrate in winter, and special attention should be paid to local climatic conditions at that time.
(Some materials on this website are from the Internet. If any information displayed on this website infringes your copyright or other legitimate rights and interests, please notify us promptly and we will remove it immediately.)

中文
English

工程合作